← Back to HomeStage 1: Structural Construction
Foundation → Columns → Beams → Slabs
Best Practice
- • Follow soil test report and structural drawings strictly
- • Use M25 grade concrete (or as specified by the structural engineer)
- • Maintain proper cover to steel using cover blocks (40–50 mm in foundation)
- • Structural engineer must inspect reinforcement before every major casting
- • Use proper vibration during concreting to avoid honeycombing
- • Minimum 14 days continuous curing for slabs
- • Use reputed brand cement and Fe 550D / Fe 500D steel with test certificates
- • Do proper anti-termite treatment at foundation level
- • Provide proper DPC at plinth level
Minimum Acceptable
- • Use at least M20 concrete if allowed in the structural drawing
- • Minimum 7–10 days curing
- • At least one engineer visit before slab casting
- • ISI marked cement and steel from known brands
- • Basic cover blocks and compaction
Checklist
- ☐ Soil test report available and shared with structural engineer
- ☐ Excavation depth and size match the approved drawing
- ☐ PCC completed and levelled
- ☐ Reinforcement placement and spacing checked against drawing
- ☐ Cover blocks properly placed
- ☐ Shuttering is strong, aligned, and leak-proof
- ☐ Electrical and plumbing sleeves placed (if required)
- ☐ Concrete grade confirmed
- ☐ Curing arrangement (water, gunny bags, etc.) ready before casting
- ☐ Structural engineer inspection done before casting
Red Flags
- ⚠️ Contractor wants to reduce foundation depth
- ⚠️ No soil test or structural engineer involvement
- ⚠️ Using rusted steel
- ⚠️ Casting without proper cover blocks
- ⚠️ No proper curing plan
- ⚠️ Rushing to cast slab without inspection